Asbestos — If You Find It and Who Does the Work (Part 2 of 2)

Lines in italics are for the reader, not the crew. How to read a talk

Printable version with sign-in sheet (PDF)

Read this out loud

Morning, everybody. This is part two about asbestos. Part one was the report: the owner finds out before the work starts, and you ask to see it. Today is what to do if you find something, and who does the work.

If you find something

You open a wall, and there's old pipe wrap that isn't in the report. Or tile under the carpet that nobody mentioned.

Stop. Don't break it, sand it, saw it, grind it or sweep it up. Back off and tell your supervisor right away.

The rule gives your company twenty-four hours to tell the owner and the other employers on the site about newly found asbestos material. They can only do that if somebody tells them. That somebody is you.

When the rule describes asbestos work, its examples include asbestos-containing wallboard, floor tile and sheeting, roofing and siding shingles, and construction mastics, the glues. Wallboard, siding shingles and mastics aren't assumed to be asbestos, but they can be. If somebody knows or should know they are, they're treated as asbestos. Asphalt and vinyl flooring put in by nineteen eighty is assumed to be asbestos. If you can't tell what something is in an old building, ask before you cut it.

Who does the work

Asbestos work is its own trade in Washington. On anything that counts as an asbestos project, only certified asbestos workers do the work. Abatement projects, meaning three square feet or three linear feet or more of asbestos material, are supervised by certified asbestos supervisors.

What makes a job an asbestos project? Removing pipe, boiler or duct insulation, or sprayed or troweled surfacing, always does. So does any work on pipe insulation. So does work that needs critical barriers or a negative pressure enclosure. So does work that breaks the material up, like chipping, grinding or sanding old vinyl asbestos floor or roofing. Some work on material that stays intact, or on less than one square foot, may not count. But sawing a square foot or more of intact roofing still takes certified workers.

Work that is not an asbestos project still needs training first: before your first assignment, and at least once a year after, in a way you can understand. If you have not had that training, it is not your job. Somebody always says, "It's just a little piece, I'll knock it out." Fair enough, it's a little piece. It's also the rule, and your lungs.

Signs

If you see a sign that starts with "Danger, Asbestos," and says authorized personnel only, that's a regulated area. If you are not authorized, you don't go in. Not to grab a tool, not to take a shortcut.

Talk it over

  1. What would you do if you opened a wall and found old pipe insulation?
  2. Who here is trained or certified for asbestos work, and who do we call if we find some?

Before you go

Stop if you find something new. Tell your supervisor. Leave asbestos to the people trained and certified for it.

Short on time, or no one to lead it? Doc and Red can run this talk for you in the R Safety Hub app.

Get started

Reference (not read aloud). Washington: WAC 296-62-07721(2)(d) (newly discovered ACM or PACM conveyed to the owner and other employers within 24 hours), (4)(a), (b) (regulated area signs: DANGER, ASBESTOS, MAY CAUSE CANCER, CAUSES DAMAGE TO LUNGS, AUTHORIZED PERSONNEL ONLY); 296-62-07703 (asbestos abatement project: three square feet or three linear feet or more; Class II work includes removal of asbestos-containing wallboard, floor tile and sheeting, roofing and siding shingles, and construction mastics); 296-62-07722(1)(a), (b) (only certified asbestos workers on an asbestos project; certified supervisors on abatement projects), (1)(c) (training where certification does not apply), (2) (training before or at initial assignment unless equivalent training in the previous twelve months, and at least annually), (3)(a), (b)(i), (b)(ii), (c) (what is an asbestos project: Class I work; Class II work needing critical barriers, equivalent isolation or negative pressure enclosures, or where the material does not stay intact, including chipping, grinding or sanding vinyl asbestos floor or roofing; Class III and IV work with pipe insulation or with one square foot or more of material that does not stay intact; not projects: Class II work on intact material or under one square foot, Class III and IV work under one square foot other than pipe insulation), (4) (training hours for non-project work, not stated in the talk), (5) (training in a manner the employee can understand). Federal: 29 CFR 1926.1101(k) (newly discovered material conveyed within 24 hours). Differences seen: Washington adds worker certification (chapter 296-65 WAC, not read). "Work on pipe insulation does [make an asbestos project]" is our plain summary of 296-62-07722(3)(a), (c)(i)(C); "work that needs barriers or an enclosure" and "breaks the material up" summarize (3)(b)(i); "may not be" covers (3)(b)(ii) and (3)(c)(ii). "Don't break it, sand it, saw it, grind it or sweep it up; back off and tell your supervisor" is good practice, not rule text. Examples ("pipe wrap", "tile under the carpet") are our plain examples.