Morning, everybody. Pour day. Everybody's moving fast, the truck is waiting, the concrete is setting whether we're ready or not. This is part one of two. Part two is tools on the deck, forms and shoring.
The bucket
Nobody works under a concrete bucket while it's going up or coming down into place, whatever is lifting it. Vibrator crews too: stay out from under a bucket hanging from a crane or cableway. Where it can be done, the bucket's route is planned so nobody, or as few people as possible, is under its path.
Nobody rides a concrete bucket. For any reason.
Buckets with hydraulic or air gates have a safety latch so they can't dump early. If the latch is missing or broken, say so before the bucket flies.
The pump and the hose
The end hose that swings free, the whip hose, gets nothing hung on it. No hooks, no valves, no add-ons. And a hose with couplings on both ends is not used as a whip hose. If it lets go, a coupling on the end becomes a hammer.
The placing boom places concrete. It is not used to drag hoses around or to lift anything else. The pump sits on its outriggers set the way the maker says.
Nobody stands on the guard over the pump's agitator while the pump or agitator is running. The pump must have a clearly labeled emergency stop. Knowing where it is before the pour starts is on you; that part is good practice.
The pipe that carries the concrete is supported and anchored so it can't move or overload the clamps. Pipe clamps are rated at least to the pump's pressure and kept clean where they grip. If quick-connect clamps are used on a vertical run, they are pinned or secured so they can't open. And the rule says no pumping through grooved-end couplers.
Cleaning out the line
When they blow out the pump line with compressed air, the pipe is anchored first. The flexible discharge hose comes off. A trap basket or containment device is there, secured, to catch the clean-out device. The air system has a shutoff valve, and the blow-out caps have a bleeder valve to relieve the pressure. Anybody not needed for the cleaning leaves the area. And delivery pipes are depressurized before clamps and fittings come loose.
If an inspection finds something that could hurt someone, the pump or boom doesn't go back to work until it's fixed. After a structural failure, an overload or touching a power line, it is certified safe by the maker, the maker's agent or a professional engineer first.
The truck
Ready-mix truck on a slope while it's discharging? Wheels blocked, brakes set.
Talk it over
- Where will the bucket or boom be swinging today, and who might be under it?
- Where is the pump's emergency stop, and who is staying out of the clean-out area?
Before you go
Never under the bucket. Nothing on the whip hose. Everybody clear for the blow-out.