Digging Near Buried Utilities

Lines in italics are for the reader, not the crew. How to read a talk

Printable version with sign-in sheet (PDF)

Read this out loud

Morning, everybody. Today is about what is under our feet before we dig. Gas, power, water, sewer, phone, fiber. You can't see any of it, and a shovel can't either.

And in Washington, digging means more than trenches. The law counts any time earth or rock gets moved, even setting a sign post.

Before anybody digs

The dig area gets outlined in white paint, or white flags where paint won't work. Then the one-call locator service gets told about the job, at least two full business days ahead and no more than ten. That call sends the word to the utility owners, and they come out and mark their lines.

Nobody digs until every utility owner with lines in that dig area has marked their lines or answered. Not "most of them." All of them.

Someone the company picks makes that call and gets a ticket number. Before you dig, it's fair to ask, "What's our ticket, and is it clear?"

The marks don't last forever. They run out forty-five days after the call. After that, a new call before any more digging. And while we're working, it's on us to keep the marks accurate. If they get scraped off, the paint doesn't grow back.

One more catch. Private lines that a customer owns on their own property, like a line out to a shop, are the customer's to locate. The utility's marks may not cover them. But the rule still says the lines we can expect to hit get located before we dig. Good practice: if you think there's a private line, ask before the hole gets opened.

Digging near a mark

A mark only has to be within two feet of the line on either side. That's not exact. The rule says when we get close, we find the exact spot by safe and acceptable means. The law names the careful ways: hand digging when practical, small test holes called potholing, vacuum digging, and air-powered hand tools. If we're boring under the ground, the lines get exposed first, so we're not boring blind.

Our own advice: the excavator bucket is many things. A way to find a line is not one of them.

While the hole is open, any line we uncover gets protected, supported, or removed by its owner as needed, so it doesn't sag or break. That goes for backfill time too.

If something goes wrong

If you find a line that wasn't marked, stop digging near it and tell your supervisor right away. We have to notify the utility through the locator service immediately.

If you touch it, nick it, or scrape the coating, treat it as contact. Stop and tell your supervisor. We have to call the line's owner and the locator service, and report the damage. And a damaged line never gets buried until it's fixed or moved.

If it's gas you smell or hear, or anything that's an emergency, also call 911. Good practice: get everybody back and away, shut down engines if it's safe, no lighters, no flipping switches, and call from a safe distance.

Talk it over

  1. Has anybody here dug near a mark and found the line somewhere else?
  2. On this job, who has the locate ticket, and when do the marks run out?

Before you go

White paint first, call first, wait for every mark, go careful near the marks, and stop and call if you hit anything.

Short on time, or no one to lead it? Doc and Red can run this talk for you in the R Safety Hub app.

Get started

Reference (not read aloud). Washington: RCW 19.122.020(3), (10), (22), (40) (business day; excavation includes installing signs; marking; work-to-begin date two to ten full business days); RCW 19.122.030(1)(a) (white lining or white pin flags, then notice through a one-number locator service), (2) (two to ten full business days), (4)(d) (end user locates the facilities they own on their own property), (5) (no excavation until all known operators have marked or given information; on and after January 1, 2026, positive response from all operators), (6) (excavator maintains the marks; marks expire 45 calendar days after notice), (10) (unidentified facility: stop excavating in the vicinity and notify through the locator service); RCW 19.122.040(2) (reasonable care: precise location, plan, support including during backfill, safe methods; pneumatic hand tools named for hard surfaces); RCW 19.122.050(1) (contact or damage: notify the operator and the locator service; emergency: call 911; no damaged facility buried until repaired or relocated); WAC 296-155-655(2)(a) to (d) (locate before opening; contact owners; exact location by safe and acceptable means; protect, support or remove while open). Federal: 29 CFR 1926.651(b)(1) to (4) (federal adds: if owners cannot respond within 24 hours, unless state or local law sets longer, the employer may proceed with caution using detection equipment; Washington's dig law requires positive response first). "Treat a scrape as contact" is our plain reading: RCW 19.122.020(5) defines damage to include harm to the protective coating, and 19.122.050(1) covers contact or damage. RCW 19.122.020(31) (reasonable accuracy: within 24 inches of both sides), (32) (safe and careful methods: potholing, hand digging when practical, vacuum excavation, pneumatic hand tools); 19.122.040(2)(e) (directional boring: physical exposure, no blind boring); 19.122.050(1) also requires reporting under 19.122.053. Asking about private lines, the bucket line and the gas-leak steps (get back, no ignition sources, call from a distance) are good practice, not rule text. The marking color code is set by an outside standard the law points to; this talk does not detail it.