Falling Objects From Scaffolds

Lines in italics are for the reader, not the crew. How to read a talk

Printable version with sign-in sheet (PDF)

Read this out loud

Morning, everybody. Today is for everybody who works on a scaffold, and everybody who walks under one. That's all of us.

A tape measure dropped from three stories doesn't land like a tape measure. And the person under it never sees it coming.

Hard hats, plus more

If you could be hit by something from above, you wear your hard hat. But on scaffolds, a hard hat alone isn't the whole answer. The federal rule says so in plain words, and the Washington rule asks for more too. The people below also need protection from tools, material and equipment falling off the platform. The company picks one or more of these.

A barricade, to keep people out of the area where things could land.

A toeboard along the edge of the platform anywhere something could fall on somebody below.

Paneling or screening from the top rail down to the toeboard or the platform, where the toeboard alone isn't tall enough to stop what's up there. Think of a stack of block or siding.

A guardrail with openings small enough that the stuff up there can't slip through.

Or a canopy, debris net or catch platform over the people below. It has to catch or turn away what falls, be strong enough to take the hit, and sit between the hazard and the people.

Toeboards

When toeboards are used, they're at least three and a half inches tall, fastened securely along the outer edge, strong enough to take a good push, and long enough to protect the people below. The gap under them is no more than a quarter inch. They're solid, or the openings are an inch or less.

Good practice: if you see a toeboard missing, kicked loose or pulled off to make room, say so. Don't just step around it.

Big and heavy stuff

Some things are too big or heavy for the toeboard or screen to stop. Those get moved back from the edge, and tied down if they need it. Lumber, a bucket of mud, a bundle of siding. Back from the edge.

Hoisting near the scaffold

When a load is being lifted onto or near a scaffold, and it could swing into it, someone controls it with a tag line, or something that does the same job. A swinging load can knock a scaffold, and the people on it.

Good practice

Not rule text. Keep tools in a bag or tied off up top. Don't throw anything down. Look up before you walk under a scaffold, and walk around a barricade, never through it.

Talk it over

  1. Where on this job are people walking under a scaffold right now?
  2. What's sitting near the edge up there that shouldn't be?

Before you go

Hard hats on, the falling-object protection in place, heavy stuff back from the edge, tag lines on swinging loads, and stay out of the barricade.

Short on time, or no one to lead it? Doc and Red can run this talk for you in the R Safety Hub app.

Get started

Reference (not read aloud). Washington: WAC 296-874-20066 reference note (hardhats and possibly other PPE for overhead hazards, chapter 296-800 WAC, WAC 296-800-160), (1)(a) to (e) (protect employees from being struck by tools, materials or equipment falling from a scaffold by one or more of: barricade; toeboard; paneling or screening from guardrail top to toeboard or platform; guardrail with small enough openings; canopy, debris net or catch platform that contains or deflects, withstands the impact, and is between the hazard and employees), (2) (objects too large or heavy for the protection used are moved away from the edge and secured as necessary); 296-874-20070(1) to (6) (toeboards at least 3 1/2 inches; securely fastened along the outer edge; long enough to protect employees below; gap at the bottom 1/4 inch or less; solid or openings 1 inch or less; withstand 50 pounds; float scaffold exemption); 296-874-20044 (tag line or equivalent to control loads hoisted onto or near a scaffold that could swing and contact it). Hard hats on construction sites: WAC 296-155-205. Federal: 29 CFR 1926.451(f)(9) (tag lines), (h)(1), (h)(2), (h)(4) (hard hats plus additional falling-object protection; toeboard specifications). "The company picks" is our plain wording for "you must ... by doing one or more"; the examples (tape measure, block, siding, mud) and the good-practice paragraph are plain explanation or good practice, not rule text. The toeboard's fifty-pound strength line is in the rule but not read aloud. "Strong enough to take a good push" is our plain wording for the fifty-pound line.