R Safety Hub R Safety Hub Your prescription for a safer workplace

Material Hoists — Loading and Keeping Out (Part 2 of 2)

Lines in italics are for the reader, not the crew. How to read a talk

Printable version with sign-in sheet (PDF)

Read this out loud

Morning, everybody. This is part two about the material hoist. Part one was the rule: nobody rides, and the landing gates stay latched. Today is the shaft, loading, and what to report.

Staying out of the shaft

Nobody goes into the hoistway, the shaft where the hoist runs, unless the power that runs it is locked out. Not to grab a dropped tape, not to clear a jam. Lock it out first, under the state's lockout rule, or get the person who can. Never reach in while the hoist is moving; that is plain sense.

The tower and the cage

A hoist tower can be enclosed on all sides for its full height with screen, except at the landings, or open. If it is open, the platform or car itself has to be caged on all sides for the full height between the floor and the cover, with gates for loading and unloading, and the unused sides of the tower at ground level get a six-foot enclosure. The operator's station gets heavy overhead protection too. And car arresting devices have to work if the rope fails.

Loading

The rated load is posted on the car or platform, and the company has to follow the maker's limits. So don't go over it. The operating rules and the signal system are posted at the operator's station. Know them and use them.

Long material, like pipe or lumber, gets fastened together and tied to the cage or platform, so no part can fall off or stick out past the sides. A board sticking out of a moving hoist catches on the tower, and then it comes down.

The top of the cage has a solid cover, so things that drop don't land on the people loading. It can be built in hinged sections that lift for long material. If the cover is open or missing, say so.

If something looks wrong

If you see damage, don't use it; that is plain sense too. A gate that won't latch, a missing sign, a missing piece of the cage. And the rope. For a material hoist, the rule takes the rope out of service for six randomly spread broken wires in one rope lay, or three in one strand in one lay. For abrasion, flattening or peening that costs more than a third of the original diameter of the outside wires. For heat damage from a torch, or damage from touching electrical wires. And for the rope shrinking in diameter past the limits in the rule. Personnel hoists have a longer list. You are not the inspector. Tell your supervisor, and the competent people check it.

Talk it over

  1. Where is the rated load posted on our hoist, and how is the long material tied?
  2. Who checks the rope, and who do we tell if the cover is missing?

Before you go

Never into the shaft without lockout. Tie down the long stuff. See damage, don't use it, say so.

Short on time, or no one to lead it? Doc and Red can run this talk for you in the R Safety Hub app.

Get started

Reference (not read aloud). Washington: WAC 296-155-77105(1)(a) (maker's specifications and limitations), (1)(b) (no one enters a hoistway unless the power is locked out under WAC 296-155-429, the state's lockout and tagging rule for circuits; the talk says "the state's lockout rule"), (1)(c) (rated load capacities, speeds and special warnings posted on cars and platforms), (1)(d)(i) to (iv) (the material hoist rope list, from the general requirements the material hoist section relies on; personnel hoists have a longer list at 296-155-77105(3)(u), which the talk mentions in one line; wire rope removed from service: six randomly distributed broken wires in one rope lay or three in one strand; abrasion, scrubbing, flattening or peening causing loss of more than one-third of the original diameter of the outside wires; heat damage from a torch or damage from contact with electrical wires; reduction from nominal diameter beyond the listed limits), (2)(a)(i) (operating rules and signals posted at the operator's station), (2)(c), (2)(c)(i), (ii) (overhead covering on the cage or platform; hinged sections allowed; long material fastened together and made fast), (2)(d) (overhead protection at the operator's station), (2)(e)(i), (ii) (enclosed tower, or open tower with the platform or car caged on all sides with gates, and a six-foot enclosure on unused tower sides at ground level), (2)(f) (car arresting devices). Federal: 29 CFR 1926.552(a), (b). "Know the signals and use them" and "you are not the inspector" are good practice; the rule requires the rules and signals to be posted.