R Safety Hub R Safety Hub Your prescription for a safer workplace

Material Hoists — No Riders and Gates (Part 1 of 2)

Lines in italics are for the reader, not the crew. How to read a talk

Printable version with sign-in sheet (PDF)

Read this out loud

Morning, everybody. Today is the material hoist, the one that takes drywall, block and buckets up the building so our backs don't have to. It saves a lot of stairs. Which is why, sooner or later, somebody looks at the empty platform going up and thinks, "Why walk?" This is part one of two. Part two is loading, the shaft, and what to report.

No riders

Here is the rule, plain. Nobody rides a material hoist. The only exception is for inspection and maintenance. Not to get to the fifth floor, not to ride up with the load to keep it steady, not because the stairs are blocked. The hoist has to be posted with the words "No riders allowed."

And nobody rides on top of a material hoist, a personnel hoist or a permanent elevator, except for inspection, maintenance, or putting in or taking down an elevator.

The personnel hoist is a different machine

A material hoist is built to carry material. On a multistory building where the trip up is more than sixty feet from ground level access, the rule requires a personnel hoist for the crew. If there is no way up but the stairs, take the stairs. That is plain sense.

What makes a personnel hoist different? The car is enclosed on all sides and the top, except the entrance, which has its own gate or door. The hoistway doors or gates have mechanical locks that can't be opened from the landing side. Electric contacts stop the hoist from moving when a door or gate is open. There is an emergency stop switch in the car, marked "stop." When it carries workers, an attendant gives the signals. Before it goes into service, it's inspected and tested under a competent person. After that it is inspected and tested at least every three months, with records kept for the job.

The landing gates

Every landing entrance to the hoistway, whether anybody is using that floor or not, has a gate or bars across the full width of the opening. They are painted in diagonal stripes, like black and yellow. The bars sit between thirty-six and forty-two inches off the floor, and the gates and bars have a latch.

That gate is the only thing between you and the open shaft. Keep it latched unless you're loading or unloading. That's plain sense, not rule text. Never lean through the gate to look up or down the shaft. The platform doesn't slow down for your arm.

Talk it over

  1. Has anybody ever seen someone ride a material hoist, and what did we do about it?
  2. Which landing gates on this job get left open, and why?

Before you go

Nobody rides. Stairs, or a personnel hoist. Gate latched.

Short on time, or no one to lead it? Doc and Red can run this talk for you in the R Safety Hub app.

Get started

Reference (not read aloud). Washington: WAC 296-155-77105(1)(h) (no riding on top of material hoists, personnel hoists or permanent elevators except inspection, maintenance, elevator installation or dismantling), (2)(a)(i), (ii) ("No riders allowed" posted; no riding except inspection and maintenance), (2)(b) (substantial gates or bars, full width, diagonal contrasting stripes; bars 2 by 4 or equivalent, two feet from the hoistway line, 36 to 42 inches above the floor; latching device), (3)(a) (personnel hoists required on multistory buildings where vertical travel exceeds 60 feet from a ground level access point), (3)(e), (f), (g), (i), (j), (q), (s) (personnel hoist doors with mechanical locks not operable from the landing side; cars enclosed on all sides and top except entrances; electric contacts; attendant signals when carrying workers; emergency stop switch marked "stop"; inspection and test before service and at not more than three-month intervals, records kept for the job). Federal: 29 CFR 1926.552(a), (b)(1) to (b)(3). "Keep the gate latched unless loading or unloading," "never lean through" and "take the stairs" are good practice, not rule text. The WAC also points to ANSI material hoist and personnel hoist standards ((2)(h), (3)(t)); this talk does not describe them.