R Safety Hub R Safety Hub Your prescription for a safer workplace

Tilt-Up and Precast Panels — Working Near the Lift

Lines in italics are for the reader, not the crew. How to read a talk

Printable version with sign-in sheet (PDF)

Read this out loud

Morning, everybody. Today is about concrete wall panels. Tilt-up panels poured flat on the slab and stood up with a crane, and precast pieces trucked in and set. They're big and they're heavy. Until it's tied in for good, it's standing there on braces and trust.

The engineering is somebody else's job. Washington's rule says there's a written plan on site for a tilt-up job, with the lifting steps, the inserts and the braces. Our job is to stay out of the way of the pick, and leave the braces alone.

During the pick

The rule says workers keep clear of the underside of a panel while it's being lifted. And anyone not part of the lift stays clear of the danger area where panels are being raised, moved or set. If you're not on the lift crew, the pick is not your shortcut.

There's a qualified signal person for the lift, picked by the company, standing where they can see the crane operator and the crew. Don't wave at the operator. Don't yell directions. If you see a problem, tell the signal person.

The rule also says tilt-up panels don't get set when the wind could make it dangerous. If it's gusting and someone wants to keep going, tell the supervisor.

After it's up

Once a panel is standing, the rule says it stays supported so it can't tip over or collapse until the permanent connections are done. A panel not held some other way gets at least two braces. And each panel is braced or secured before the crane lets go.

So the braces are not in our way. We're in theirs. Don't unbolt one, don't loosen one to get a lift through, and don't bump one with a forklift or a loader. If a brace has to come out for a while, the rule says something else has to hold the panel in the meantime. That's for the supervisor and the erection crew to set up, not us.

Don't hang anything off a brace, and don't tie a tarp to one. Wind on a tarp pushes the panel. If you see a brace that's loose, bent, missing a pin or knocked out of place, stay back from that panel and tell your supervisor right away.

Somebody always says, "It's a ten-inch concrete wall, it's not going anywhere." It went somewhere once already today. Straight up.

Talk it over

  1. Who's our signal person, and how do we get their attention?
  2. What would make the danger area for today's picks easier for everyone to see and stay out of?

Before you go

Clear of the pick, hands off the braces, nothing hung on them, and a bad brace gets reported right now.

Short on time, or no one to lead it? Doc and Red can run this talk for you in the R Safety Hub app.

Get started

Reference (not read aloud). Washington: WAC 296-155-691(3) (before pouring tilt-up panels, plans or job specifications including lifting procedures, at the job site; type, size and location of lifting and brace inserts, brace sizes, concrete strength before lifting); (4)(b) (precast wall units, structural framing and tilt-up panels adequately supported to prevent overturning and collapse until permanent connections are completed); (4)(e) (each panel section not secured by other means has a minimum of two braces; guy wires may be used instead of stiff-leg braces); (5)(b) (tilt-up panels not set when wind velocity could create a hazardous condition); (5)(c) (designated qualified signal person, consults the operator before the pick, located to observe both the operator and the employees in the immediate area); (5)(d) (workers keep clear of the underside of the panel during lifting); (5)(e) (people not involved in the lifting process kept clear of the hazardous area where panels are raised, moved or placed); (5)(f) (if braces must be removed temporarily, other effective means support the panel in the interim); (5)(g) (each panel braced or secured before the hoisting equipment is removed). Design factors, insert strengths and brace angles ((1), (2), (4)(a), (c), (d), (f) to (n)) are engineering and rigging detail, not in the talk. Federal: 29 CFR 1926.704(a) (adequately supported until permanent connections), (e) (no employee under precast members being lifted or tilted except those required for erection). "Big and heavy," "braces and trust," "the pick is not your shortcut," "if it's gusting, tell the supervisor," "don't wave at the operator, don't yell directions, tell the signal person," "don't unbolt, loosen or bump a brace," "don't hang anything off a brace or tie a tarp to one; wind on a tarp pushes the panel," "stay back from that panel," and the ten-inch wall joke are plain explanation or good practice, not rule text.