Morning, everybody. Today is about holes in the ground. Trenches, footings, utility cuts, anything we dig.

Here's the thing about dirt. It looks solid. It holds still for hours. Then a wall lets go all at once, with no warning, and it's heavy. A trench wall doesn't fall like a shovelful. It comes in as a block. Nobody outruns it, and nobody digs a buddy out fast with their hands. So the only real plan is to keep the wall from reaching you in the first place.

Four feet, not five

You may have heard five feet is the magic number. That's the federal rule. In Washington, it's four.

If a trench is four feet deep or more, everybody in it needs cave-in protection. That means the walls are sloped back, cut in steps called benching, held with shoring, or you work inside a trench box. The only ways out of that are solid rock, or a trench under four feet where a competent person has looked at the ground and seen no sign it could cave.

Four feet is about belt-high on most of us. That's shallower than it feels.

A way out

Any trench four feet deep or more needs a ladder, stairs or a ramp. And you should never have to walk more than twenty-five feet sideways to reach it. If the ladder is way down at the other end, move the ladder, not your luck.

Keep the pile back

The dirt we dig out is called spoil. It has to sit at least two feet back from the edge, or be held back some other way. Same goes for tools, pipe and equipment. A pile right on the lip pushes on the wall and can roll right in on whoever's below. And nobody stands under a load on a digger or an excavator bucket. Ever.

Call first, dig second

Before a trench gets opened, the buried lines have to be located. Power, gas, water, phone, sewer. The utility owners get asked to mark them before digging starts. When we get close to a marked line, the rule says we find its exact location by safe means. Not by guessing with the bucket.

The competent person

Every trench job has a competent person. That's someone who knows the rules, can spot the hazards, and has the authority to stop the work and fix it. In Washington, a competent person has to be on site any time trench work is going on.

They check the trench every day before work starts, during the shift as needed, and after every rainstorm. Rain changes everything in a trench. If they see cracks at the top, soil sloughing off the walls, water seeping in, or a trench box shifting, everybody comes out until it's made safe. No arguing. Climb out, then talk.

And if water is pooling in the bottom, nobody works in it until it's handled.

Note for the reader: say who the competent person is on this job.

The written plan

Washington also wants a written trench plan when a protective system is required, kept on site. You get trained on it before you go in. If nobody has walked you through it, ask before you step down.

Talk it over

  1. Who is our competent person today, and when did they last look at this trench?
  2. Where's our ladder, and how far is it from where you're working?

Before you go

Four feet means protection. Ladder within twenty-five feet. Spoil two feet back. And when the competent person says out, we climb out.

Short on time, or no one to lead it? Doc and Red can run this talk for you in the R Safety Hub app.

Get started

Reference (not read aloud). Washington: WAC 296-155-657(1)(a) (cave-in protection; exceptions stable rock, or under four feet with a competent person's check); -655(3)(b) (way out at four feet, no more than twenty-five feet of travel); -655(10)(b) (materials two feet from the edge); -655(5) (no one under loads); -655(2) (utilities located before opening, exact location by safe means); -652(6) (competent person); -655(11) (daily inspection, after every rainstorm, remove employees); -655(13) (competent person on site; written trench plan and training); -655(8) (water). Federal: 29 CFR 1926.651(c)(2), (j)(2), (k); 1926.652(a)(1) (federal trigger is five feet). "A wall comes in as a block" and "nobody digs a buddy out fast" are plain warnings, not quoted rule text. The warning signs named (cracks at the top, sloughing walls, seeping water, a shifting box) are common examples of what the rule calls evidence of a possible cave-in; the rule itself does not list them.