R Safety Hub R Safety Hub Your prescription for a safer workplace

Working Near Pile Driving

Lines in italics are for the reader, not the crew. How to read a talk

Printable version with sign-in sheet (PDF)

Read this out loud

Morning, everybody. There's a pile driver on this job, and you'll hear it before you see it. Today is about working near one, whether you're on the pile crew or just walking past to get to your own work.

A pile driver lifts a long, heavy pile, stands it up in the leads, and drives it into the ground with a hammer that drops or pounds over and over. Everything about it is big, heavy and moving.

Stay clear of the pick

Washington's rule says all employees are kept clear while a pile is being hoisted into the leads. That's when a pile can swing, slip or drop. Nobody stands in that zone.

One signal person

The rule says every pile crew has one signal person, picked by the company. The operator takes signals from that person and no one else, except the worker up in the leads when they're up there. And the hammer only comes down on that worker's signal. So nobody else waves, points or yells at the operator. Not even to help.

Never under the hammer without the block

The rule says whenever anyone is working under the hammer, a blocking device that can hold the hammer's full weight goes in the leads under it. No block, nobody goes under. Not for a second, not to grab a tool.

Hoses that whip

Steam and air hoses to the hammer get chained or cabled so they can't whip around if a joint lets go, and every hose connection gets a safety chain or something like it. If you see a hose connection with no chain, tell the pile crew's foreman or your supervisor, and stay back from it.

A few more from the rule

The equipment gets a visual check at the start of every shift.

When steel tube piles are being blown out, everyone stays well out of range of falling material.

When pile tops need to be cut off, driving stops, unless the cutting is at least twice the length of the longest pile away from the driver.

If piles are driven in a dug pit, the pit walls get sloped to the angle the soil will stand at, or sheet-piled and braced. Access pits for jacked piles need ladders and solid curbs to keep things from falling in.

Working with creosote timber piles means protective gear: cream on exposed skin, gloves and eye protection.

The rule lists more for the pile crew; these are the ones that matter to everyone nearby.

Somebody always says, "I'll just duck under real quick." The hammer doesn't do real quick. It does heavy.

Talk it over

  1. Who's the signal person, and who do we tell if something looks wrong?
  2. What would help everyone walking past the driver know when to stop and wait?

Before you go

Clear of the pick, one signal person, never under the hammer without the block, and stay back from hoses and blow-outs.

Short on time, or no one to lead it? Doc and Red can run this talk for you in the R Safety Hub app.

Get started

Reference (not read aloud). Washington: WAC 296-155-620(1)(e) (blocking device capable of supporting the hammer's weight placed in the leads under the hammer at all times while employees work under the hammer); (1)(h) (visual inspection of all working equipment at the beginning of each shift); (1)(m) (steam hose to a steam hammer or jet pipe attached to the hammer with at least 1/4-inch chain or cable to prevent whipping; air hammer hoses the same); (1)(n) (safety chains or equivalent for each hose connection); (1)(x) (a designated signalperson in every crew; the driver operator or drum person receives signals from no others, except when the loftworker is above; hammer not lowered except on the loftworker's signal); (3)(a) (engineers and winchpersons accept signals only from the designated signalperson); (3)(b) (all employees kept clear when piling is hoisted into the leads); (3)(c) (excavated pit walls sloped to the angle of repose or sheet-piled and braced); (3)(d) (employees kept well beyond the range of falling materials when steel tube piles are blown out); (3)(e) (driving suspended when pile tops are cut off, except where cutting is at least twice the length of the longest pile from the driver); (3)(f) (jacked pile access pits with ladders and bulkheaded curbs); (3)(u) (protective equipment with creosote timbers: protective creams on exposed skin, gloves and eye protection). Equipment design, barge and floating-rig items ((1)(a) to (d), (f), (g), (i) to (l), (o) to (w), (y); (2); (3)(g) to (t), (v) to (x)) are for the pile crew and not in the talk. Federal: 29 CFR 1926.603 (pile driving equipment). The plain description of a pile driver, "big, heavy and moving," "nobody else waves, points or yells," "not for a second, not to grab a tool," "tell the pile crew's foreman or your supervisor, and stay back," and the "real quick" joke are plain explanation or good practice, not rule text.